Baselight

2018 Sidewalk Repair And Reconstruction Projects

City of Bloomington

@usgov.city_of_bloomington_2018_sidewalk_repair_and_reconstru_0eb16cf1

Loading...
Loading...

About this Dataset

2018 Sidewalk Repair And Reconstruction Projects

A summary of all the concrete sidewalk repair and reconstruction projects that occurred during 2018. This includes work done in association with the City's Sidewalk Assistance Program, as well as general maintenance, repair and reconstruction to sidewalk segments, driveway entrances, curbs and ramps

This summary includes all projects that were completed both by City of Bloomington Street Department crews and those that were performed by personnel from Groomer Construction, which was contracted by the City of Bloomington to assist with sidewalk and ramp repair work in 2018.
Organization: City of Bloomington
Last updated: 2023-05-20T03:42:54.385896

Tables

Table 1

@usgov.city_of_bloomington_2018_sidewalk_repair_and_reconstru_0eb16cf1.table_1
  • 21.3 KB
  • 4207 rows
  • 25 columns
Loading...

CREATE TABLE table_1 (
  "date" VARCHAR,
  "control" DOUBLE,
  "invoice" DOUBLE,
  "billed_to" VARCHAR,
  "address" VARCHAR,
  "street_side" VARCHAR,
  "sidewalk_curb_mono_h_c_ramp_gutter_driveway_street_cut" VARCHAR,
  "length_in_feet" DOUBLE,
  "width" DOUBLE,
  "n__of_ramps" DOUBLE,
  "yards" DOUBLE,
  "plates_str" DOUBLE,
  "plates_radius" DOUBLE,
  "unnamed_column" VARCHAR,
  "unnamed_column_1" VARCHAR,
  "unnamed_column_2" VARCHAR,
  "unnamed_column_3" VARCHAR,
  "unnamed_column_4" VARCHAR,
  "unnamed_column_5" VARCHAR,
  "unnamed_column_6" VARCHAR,
  "unnamed_column_7" VARCHAR,
  "unnamed_column_8" DOUBLE,
  "unnamed_column_9" VARCHAR,
  "date_inspected" DOUBLE,
  "unnamed_column_10" VARCHAR
);

Share link

Anyone who has the link will be able to view this.