Baselight

CORDIS - EU Funded Projects Under FP1 (1984–1987)

Publications Office of the European Union

@eupublicationsoffice.fp1_cordis

FP1 Projects
@eupublicationsoffice.fp1_cordis.fp1_projects

The zip file, besides the details of the FP1 projects, also includes association details of related euroSciVoc taxonomies, legal basis, topics, organizations and links to project websites (webLinks)

  • 3.55 MB
  • 3187 rows
  • 20 columns
id

Id

acronym

Acronym

status

Status

title

Title

startdate

StartDate

enddate

EndDate

totalcost

TotalCost

ecmaxcontribution

EcMaxContribution

legalbasis

LegalBasis

topics

Topics

ecsignaturedate

EcSignatureDate

frameworkprogramme

FrameworkProgramme

mastercall

MasterCall

subcall

SubCall

fundingscheme

FundingScheme

nature

Nature

objective

Objective

contentupdatedate

ContentUpdateDate

rcn

Rcn

grantdoi

GrantDoi

RI1B0234CREATION OF A POWERFUL MANAGEMENT AND CAD SOFTWARE OPTIMIZING THE POTENTIAL OF A SMALL SHIPBUILDING FIRMMon Aug 01 1988 00:00:00 GMT+0000 (Coordinated Universal Time)Wed Sep 30 1992 00:00:00 GMT+0000 (Coordinated Universal Time)FP1-BRITEFP1CSCThis project developed a ship design which uses computer-aided design and engineering (CAD/CAE), to bring increased flexibility, productivity and design precision to small and medium-sized ship design companies. The system, called LUNAIS, offers software features which give smaller shipbuilders the …Tue Apr 14 1992 00:00:02 GMT+0000 (Coordinated Universal Time)6342
1476Integrated Sensor-Based Robot SystemTue Jan 01 1985 00:00:00 GMT+0000 (Coordinated Universal Time)Fri Jan 01 1988 00:00:00 GMT+0000 (Coordinated Universal Time)FP1-ESPRIT 1FP1The objective of this project was to develop advanced tactile and vision sensor systems, a sensorised gripper system and a sensor-integrating robot controller, and to integrate these into a flexible workpiece handling system capable of dealing with randomly oriented parts in an unstructured environm…Fri Dec 04 1992 01:04:58 GMT+0000 (Coordinated Universal Time)8338
MA1M0060COMPUTER AIDED SELECTIVE PRODUCTION PLANNING FOR COMPLEX OREBODIES.Mon Feb 01 1988 00:00:00 GMT+0000 (Coordinated Universal Time)Tue Jul 31 1990 00:00:00 GMT+0000 (Coordinated Universal Time)FP1-RAWMAT 3CFP1CSCTHE AIM OF THE RESEARCH IS TO PROVIDE THE MINING ENGINEER WITH POWERFUL TOOL ASSISTING HIM WITH SHORT TERM TO MEDIUM TERM PRODUCTION SCHEDULING. The goal of this project was to construct software tools to aid exploitation of subterranean and open mines. A concept has been developed for use in short …Wed Apr 05 2023 12:52:50 GMT+0000 (Coordinated Universal Time)11453
1609SMARTSystem Measurement and Architectures TechniquesThu May 07 1987 00:00:00 GMT+0000 (Coordinated Universal Time)Tue Nov 07 1989 00:00:00 GMT+0000 (Coordinated Universal Time)FP1-ESPRIT 1FP1The aim of the SMART project was to support the efficient production of cost-effective fault-tolerant information systems to stated design specifications. Its objective was to define techniques and to provide tools to support the design and development ofsuch systems throughout their life-cycle. Thi…Wed Nov 25 1992 00:00:02 GMT+0000 (Coordinated Universal Time)8489
395INCAAn Integrated Network Architecture for Office CommunicationsSat Sep 01 1984 00:00:00 GMT+0000 (Coordinated Universal Time)Fri Sep 01 1989 00:00:00 GMT+0000 (Coordinated Universal Time)FP1-ESPRIT 1FP1The principal purpose of the INCA project was to define and design an integrated network architecture for office communications within the framework of current international standards, particularly Open Systems Interconnection (OSI). It was also intended to demonstrate aspects of the architecture w…Wed Dec 09 1992 00:00:02 GMT+0000 (Coordinated Universal Time)8633
EN3M0073DEVELOPMENT AND DEMONSTRATION OF THE MEDEE-EUR ENERGY DEMAND MODELFri Jan 01 1988 00:00:00 GMT+0000 (Coordinated Universal Time)Tue Feb 28 1989 00:00:00 GMT+0000 (Coordinated Universal Time)FP1-ENNONUC 3CFP1CSCDOCUMENTATION OF THE RESULTS OF THE ENVIRONMENT 2020 STUDY CARRIED OUT WITH THE MEDEE-EUR MODEL FOR THE ENERGY DEMAND SECTION. SUMMARY DOCUMENT ON THE CHARACTERISTICS OF THE MEDEE-EUR MODEL. HARMONIZATION OF THE SOFTWARE SUPPORTING THE MEDEE MODEL WITH THAT OF THE OTHER MODELS. ADVANCED ENDOGENIZATI…Sun Jan 23 1994 00:00:02 GMT+0000 (Coordinated Universal Time)12678
EN3M0096IMPROVEMENT AND APPLICATION OF THE HERMES-FRANCE MODEL.Fri Jul 01 1988 00:00:00 GMT+0000 (Coordinated Universal Time)Tue Feb 28 1989 00:00:00 GMT+0000 (Coordinated Universal Time)FP1-ENNONUC 3CFP1CSCTHERE WILL BE NUMEROUS SCIENTIFIC ADVANTAGES: - THE ECONOMIC AND ENERGY SYSTEM WILL BE BROUGHT INTO SHARPER FOCUS AS THE MOST RECENT STATISTICS WILL BE TAKEN INTO ACCOUNT IN THE ASSESSMENT OF THE MODEL - THERE WILL BE A MORE EFFECTIVE LINK BETWEEN ALL OF THE HERMES MODELS SINCE THEY WILL E…Sun Jan 23 1994 00:00:02 GMT+0000 (Coordinated Universal Time)12659
874CONCORDIAIntegrated Environment for Reliable SystemsSun Dec 01 1985 00:00:00 GMT+0000 (Coordinated Universal Time)Mon Dec 01 1986 00:00:00 GMT+0000 (Coordinated Universal Time)FP1-ESPRIT 1FP1The CONCORDIA project aimed to provide an environment which integrated a set of hardware and software mechanisms and components in order to facilitate the construction and support the operation of reliable distributed application systems based on local area networks. The architecture was intended to…Wed Dec 02 1992 00:02:55 GMT+0000 (Coordinated Universal Time)8413
291LING-ANALYSISLinguistic Analysis of the European LanguagesFri Feb 01 1985 00:00:00 GMT+0000 (Coordinated Universal Time)Sat Apr 01 1989 00:00:00 GMT+0000 (Coordinated Universal Time)FP1-ESPRIT 1FP1The LING-ANALYSIS project produced the software necessary to perform grapheme-to-phoneme and phoneme-to-grapheme conversion at word level. This involved conversions between the textual and acoustical representation of words and the acquisition of the knowledge required to include speech in the man-m…Fri Sep 06 2024 17:03:24 GMT+0000 (Coordinated Universal Time)8643
EN3S0127SPECIFIC ACTION ON THE FOTAVOLTAIC PROJECTFri Jan 01 1988 00:00:00 GMT+0000 (Coordinated Universal Time)Sat Dec 31 1988 00:00:00 GMT+0000 (Coordinated Universal Time)FP1-ENNONUC 3CFP1CSCThe results from the optimisation process of the photovoltaic system indicated that the following changes would improve the performance of the plant: connection of the 2 separate battery banks to form a single 600 Ahour battery; improvement of the software for power management.THE SPECIFIC ACTIONS O…Fri Nov 24 1989 00:00:02 GMT+0000 (Coordinated Universal Time)12563

CREATE TABLE fp1_projects (
  "id" VARCHAR,
  "acronym" VARCHAR,
  "status" VARCHAR,
  "title" VARCHAR,
  "startdate" TIMESTAMP,
  "enddate" TIMESTAMP,
  "totalcost" VARCHAR,
  "ecmaxcontribution" VARCHAR,
  "legalbasis" VARCHAR,
  "topics" VARCHAR,
  "ecsignaturedate" VARCHAR,
  "frameworkprogramme" VARCHAR,
  "mastercall" VARCHAR,
  "subcall" VARCHAR,
  "fundingscheme" VARCHAR,
  "nature" VARCHAR,
  "objective" VARCHAR,
  "contentupdatedate" TIMESTAMP,
  "rcn" BIGINT,
  "grantdoi" VARCHAR
);

Share link

Anyone who has the link will be able to view this.