AT | 2014AT16RFOP001 | Investments in Growth and Employment - AT - ERDF | 8 | Adopted by EC | A.1 | 1 | Strengthening research, technological development and ... | Errichtung KLH Werk | 2019AT16RFMP001 | 1 | “Construction of a factory to produce laminated timber elements” | Approved | ADO | 102(2) | 93585925 | 6461300 | 6461300 | | submitted | Research & Innovation | TO 1 RTDI |
BG | 2014BG16M1OP001 | Transport and transport infrastructure - BG - ERDF/CF | 5 | Adopted by EC | 2 | 7 | Promoting sustainable transport and removing bottlenecks ... | АМ „Струма”, лот 3.2 | 2019BG16CFMP001 | 1 | Struma Motorway – Lot 3.2 | Withdrawn by MS | WIT | 102(2) | | | | | submitted | Network Infrastructures in Transport and Energy | TO 7 Networks |
BG | 2014BG16M1OP001 | Transport and transport infrastructure - BG - ERDF/CF | 5 | Adopted by EC | 1 | 7 | Promoting sustainable transport and removing bottlenecks ... | Модернизация на железопътната линия София-Пловдив: жп участък Елин Пелин-Костенец | 2016BG16CFMP002 | 1.1 | Modernization of Railway line Sofia-Plovdiv: Section Elin Pelin-Kostenetz | Approved | ADO | 102(2) | 554751319 | 471538621.15 | | 471538621.15 | submitted | Network Infrastructures in Transport and Energy | TO 7 Networks |
BG | 2014BG16RFOP001 | Regions in Growth - BG - ERDF | 9 | Adopted by EC | 1 | 4 | Supporting the shift towards a low-carbon economy in all ... | Интегриран Столичен градски транспорт – Фаза ІІ | 2018BG16RFMP001 | 1 | Integrated Sofia Urban Transport – phase II | Approved | APT | 102(1) | 54878744.39 | 46646933 | 46646933 | | submitted | Low-Carbon Economy | TO 4 Low Carbon |
BG | 2014BG16M1OP001 | Transport and transport infrastructure - BG - ERDF/CF | 7 | Adopted by EC | 1 | 7 | Promoting sustainable transport and removing bottlenecks ... | Рехабилитация на железопътната линия „Пловдив -Бургас”, Фаза 2 | 2016BG16CFMP001 | 2 | Rehabilitation and modernisation of the railway section Plovdiv - Burgas Phase II | Approved | ADO | 102(2) | 345169413.03 | 293394001.08 | | 293394001.08 | submitted | Network Infrastructures in Transport and Energy | TO 7 Networks |
BG | 2014BG16M1OP001 | Transport and transport infrastructure - BG - ERDF/CF | 7 | Adopted by EC | 3 | 4 | Supporting the shift towards a low-carbon economy in all ... | Проект за разширение на метрото в София: Линия 3, Етап 1 - участък "бул. Владимир Вазов - ЦГЧ - ул. Житница” | 2015BG16RFMP001 | 1 | SOFIA METRO EXTENSION PROJECT: LINE 3, STAGE I – SECTION “VLADIMIR VAZOV BLVD. – CENTRE – ZHITNITSA STR.” | Approved | ADO | 102(2) | 433080000 | 368118000 | 368118000 | | submitted | Low-Carbon Economy | TO 4 Low Carbon |
BG | 2014BG16M1OP002 | Environment - BG - ERDF/CF | 11 | Sent | 1 | 6 | Preserving and protecting the environment and promoting ... | "Интегриран воден проект за област Бургас" | 2020BG16CFMP001 | 1.2 | Burgas integrated water project | Approved | ADO | 102(2) | 88451431.84 | 63334763.25 | | 63334763.25 | submitted | Environment Protection & Resource Efficiency | TO 6 Environment |
BG | 2014BG16M1OP001 | Transport and transport infrastructure - BG - ERDF/CF | 7 | Adopted by EC | 3 | 4 | Supporting the shift towards a low-carbon economy in all ... | Проект за разширение на метрото в София: Линия 3, Етап 2 - участък "ул. Житница - ж.к. Овча купел - Околовръстен път" | 2016BG16RFMP001 | 1 | Sofia Metro Extension project, Line 3, Stage II – section "Zhitnitsa str. – Ovcha Kupel RD – Ring Road" | Approved | ADO | 102(2) | 101945322.59 | 86653524.2 | 86653524.2 | | submitted | Low-Carbon Economy | TO 4 Low Carbon |
BG | 2014BG16M1OP002 | Environment - BG - ERDF/CF | 5 | Adopted by EC | 2 | 6 | Preserving and protecting the environment and promoting ... | Трета фаза на интегрирана система от съоръжения за третиране на битовите отпадъци на Столична община - инсталация за комбинирано производство на енергия с оползотворяване на RDF | 2018BG16RFMP003 | 1.3 | “DESIGN AND CONSTRUCTION OF INSTALLATION FOR COGENERATION IN SOFIA WITH RECOVERY OF RDF – THIRD PHASE OF THE INTEGRATED SYSTEM FOR MUNICIPAL WASTE MANAGEMENT OF SOFIA MUNICIPALITY” | Cancelled | CAN | 102(2) | | | | | submitted | Environment Protection & Resource Efficiency | TO 6 Environment |
BG | 2014BG16M1OP002 | Environment - BG - ERDF/CF | 11 | Sent | 1 | 6 | Preserving and protecting the environment and promoting ... | Интегриран проект за водния цикъл на град Враца | 2017BG16CFMP001 | 1.2 | Vratsa Integrated Water Project - Phase 2 | Approved | APT | 103 | 45363156 | 34925519 | | 34925519 | submitted | Environment Protection & Resource Efficiency | TO 6 Environment |