Baselight

2021-2027 ERDF-CF-JTF Common Indicator Metadata

Regio-Eval@ec.europa.eu

@esifunds.n_4t73_mihb

Table 1
@esifunds.n_4t73_mihb.table_1

  • 94.81 KB
  • 166 rows
  • 28 columns
n__1_indicator_code

1 Indicator Code

n__2_indicator_name

2 Indicator Name

n__2b_indicator_code_and_short

2b Indicator Code And Short

n__3_measurement_unit

3 Measurement Unit

n__4_type_of_indicator

4 Type Of Indicator

n__5_baseline

5 Baseline

n__6_milestone_2024

6 Milestone 2024

n__7_target_2029

7 Target 2029

n__8_policy_objective_asterisks

8 Policy Objective Asterisks

n__8b_po_igj_original

8b Po Igj Original

n__9_indicator_usage_by_specific

9 Indicator Usage By Specific

n__9b_indicator_listing_by

9b Indicator Listing By

n__10_definition_and_concepts

10 Definition And Concepts

n__11_data_collection

11 Data Collection

n__12_time_measurement_achieved

12 Time Measurement Achieved

n__13_aggregation_issues

13 Aggregation Issues

n__14_reporting

14 Reporting

n__15_references

15 References

n__16_corresponding_corporate

16 Corresponding Corporate

n__17_notes

17 Notes

n__18_link_to_2014_2020_common

18 Link To 2014–2020 Common

order_by_annex_1

Order By Annex 1

order_by_so

Order By So

order_by_output_result

Order By Output Result

n__0_erdf

0 Erdf

n__0_cohesion_fund_72

0 Cohesion Fund 72

n__0_just_transition_fund_64

0 Just Transition Fund 64

edited_by_swd_2025_61

Edited By Swd 2025–61

RCR81Completion of joint training schemesRCR81 Interreg: Completion of joint training schemesparticipantsresult0not required>0Use in all policy objectives, whenever relevantInterregUse in all specific objectives, whenever relevantInterregThe indicator counts the number of participants completing the joint trainings schemes organised by supported projects. Completion should be documented by the training organisers either through a record of the confirmed completions or by issuing certificates of completion of the training. The certi…MA monitoring systemAt project completionDouble counting of participants in more than one training schemes organised by the same project should be excluded.Rule 1: Reporting by specific objective Forecast for selected projects and achieved values, both cumulative to date (CPR Annex VII, Table 6).--In terms of links with common output indicators, indicator RCR81 is intended to be used together with RCO85. The value reported for RCR81 can be equal to or lower than the value of RCO85 (for example in case some participants withdraw after the training started or in case not not all participants r…NEW15760157true
RCO01Enterprises supported (of which: micro, small, medium, large)RCO01 Firms: All firmsenterprisesoutput0>=0>0Use in all policy objectives, whenever relevant and under JTFPO1Use in all specific objectives, whenever relevant and under JTFRSO1.1 Enhancing research and innovationThe indicator counts all enterprises that receive monetary or in-kind support from ERDF. The enterprise is the smallest combination of legal units that is an organisational unit producing goods and services, which benefits from a certain degree of autonomy in decision making, especially for the all…MA monitoring systemIt depends on the type of support: grant (see RCO02), financial instruments (see RCO03) or non-monetary (see RCO04).Rule 1: Double counting removed at the level of the specific objective An enterprise is counted once regardless how many types of support (ex: grants and financial instrument support) receives from operations in the same specific objective. Rule 2: Double counting removed at the level of the progra…Rule 1: Reporting by specific objective Forecast for selected projects and achieved values, both cumulative to date for total RCO01 (CPR Annex VII, Table 3). Disaggregation of reported data by enterprise size required only for achieved values. Rule 2: Reporting at the level of the operational prog…ESTAT: Eurostat - OECD Manual on Business Demography Statistics, 2007 edition Commission Communication, Social Business Initiative, COM/2011/0682 final, 25 October 2011.CCO01Use together with indicators for forms of support (RCO02. RCO03, RCO04) as follows: RCO01=RCO02+RCO03+RCO04 - number enterprises with multiple forms of support (i.e. remove double counting). Check: RCO01<= (RCO02+RCO03+RCO04)CO011111truetruetrue
RCO02Enterprises supported by grantsRCO02 Firms: Grant aidedenterprisesoutput0>=0>0Use in all policy objectives, whenever relevant and under JTFPO1Use in all specific objectives, whenever relevant and under JTFRSO1.1 Enhancing research and innovationNumber of enterprises receiving monetary support in the form of grants. For the definition of an enterprise see RCO01.MA monitoring systemCompletion of output financed by the grant supportRule 1: Double counting removed at the level of the specific objective An enterprise is counted once regardless how many times it receives support from operations in the same specific objective.Rule 1: Reporting by specific objective Forecast for selected projects and achieved values, both cumulative to date (CPR Annex VII, Table 3).See RCO01-Use together with indicator RCO01.CO022112truetrue
RCO03Enterprises supported by financial instrumentsRCO03 Firms: Non grant aidedenterprisesoutput0>=0>0Use in all policy objectives, whenever relevant and under JTFPO1Use in all specific objectives, whenever relevant and under JTFRSO1.1 Enhancing research and innovationNumber of enterprises receiving support in the form of loans, interest subsidy, credit guarantee, venture capital or other financial instrument. Financial instruments in this context include quasi-equity, equity, guarantees, and loans as defined in Regulation EU 2018/1046, Art. 2: (52) ‘quasi-equit…MA monitoring systemFor loans and guarantees, first payment from the bank to the final recipient of the underlying loan. For venture capital, first investment from the support in the final recipient.Rule 1: Double counting removed at the level of the specific objective An enterprise is counted once regardless how many times it receives support from operations in the same specific objective.Rule 1: Double counting removed at the level of the specific objective An enterprise is counted once regardless how many times it receives support from operations in the same specific objective.See RCO01 for enterprises Regulation (EU, Euratom) 2018/1046 of the European Parliament and of the Council of 18 July 2018.-Use together with RCO01.CO033113truetrue
RCO04Enterprises with non-financial supportRCO04 Firms: Advisedenterprisesoutput0>=0>0Use in all policy objectives, whenever relevant and under JTFPO1Use in all specific objectives, whenever relevant and under JTFRSO1.1 Enhancing research and innovationNumber of enterprises receiving non-financial support. Enterprises are counted in the indicator if they receive the non-financial support in a structured manner such as, for example, an SMEs receiving incubator services. The support provided needs to be documented. One-off interactions (ex: phone ca…MA monitoring systemThe first time the enterprise received the non-financial support under the programme.Rule 1: Double counting removed at the level of the specific objective An enterprise is counted once regardless how many times it receives support from operations in the same specific objective.Rule 1: Reporting by specific objective Forecast for selected projects and achieved values, both cumulative to date. (CPR Annex VII, Table 3).Enterprise Europe Network - Customer Relationship Management System-Use together with RCO01.CO044114truetrue
RCO05New enterprises supportedRCO05 Firms: New Enterprisesenterprisesoutput0>=0>0Use in all policy objectives, whenever relevant and under JTFPO1Use in all specific objectives, whenever relevant and under JTFRSO1.1 Enhancing research and innovationThe number of new enterprises supported. An enterprise is considered new if it did not exist three years before the enterprise applies for the support provided. An enterprise will not be considered new if only its legal form changes. The indicator covers also spin-offs. For the definition of an ente…MA monitoring systemIt depends on the type of support: grant (see RCO02), financial instruments (see RCO03) or non-monetary (see RCO04).Rule 1: Double counting removed at the level of the specific objective An enterprise is counted once regardless how many times it receives support from operations in the same specific objective.Rule 1: Reporting by specific objective Forecast for selected projects and achieved values, both cumulative to date (CPR Annex VII, Table 3).See RCO01 for enterprises-Use together with RCO01 and indicators for form of suppport (RCO02, RCO03. RCO04).CO055115truetrue
RCR82Legal or administrative obstacles across borders alleviated or resolvedRCR82 Interreg: Legal/admin. obstacles alleviated or resolvedlegal or administrative obstaclesresult0not required>0Use in all policy objectives, whenever relevantInterregUse in all specific objectives, whenever relevantInterregLegal or administrative obstacles refer to rules, laws or administrative procedures which obstruct everyday life and the development of border regions, eligible under ETC goal. The indicator counts the number of legal or administrative obstacles that are alleviated or resvolved based on solutions id…MA monitoring system / SurveyDuring project implementation / up to one year after project completion-Rule 1: Reporting by specific objective Forecast for selected projects and achieved values, both cumulative to date (CPR Annex VII, Table 6).--In terms of links with common output indicator, RCR82 may be used together with RCO117.NEW15860158true
RCO06Researchers working in supported research facilitiesRCO06 RTDI: Researchers with improved infrastructureannual FTEsoutput0>=0>0PO1 Smarter EuropePO1RSO1.1 R&I capacitiesRSO1.1 Enhancing research and innovationNumber of researchers using directly, in their line of activity, the research facility or the equipment for which the support is awarded. The indicator is measured in terms of annual full time equivalents (FTEs), calculated according to the methodology provided in the OECD Frascati Manual 2015. The…Supported projectsThe researchers working in the research facility during the year when the project starts.Rule 1: Double counting of researchers to be removed at the level of the specific objective. A research facility may receive support several times, which may serve different researchers. On the other hand, they should not count the same researchers twice.Rule 1: Reporting by specific objective Forecast for selected projects and achieved values, both cumulative to date (CPR Annex VII, Table 3).OECD - Frascati Manual 2015CCO02The main purpose of this indicator is to measure the effective capacity of research facility supported.CO256116true
RCO07Research organisations participating in joint research projectsRCO07 RTDI: ROs in joint researchresearch organisationsoutput0>=0>0PO1 Smarter Europe and under JTFPO1RSO1.1 R&I capacities and under JTFRSO1.1 Enhancing research and innovationNumber of supported research organisations that cooperate in joint research projects. A joint research project includes at least one research organisation and another partner (such as an enterprise, another research organisation etc). Cooperation in R&D activities may be new or existing, and it shou…Supported projectsValues achieved measured upon completion of the supported R&D cooperation activity.Rule 1: Double counting removed at the level of the specific objective A research institution is considered once regardless how many times it receives support from operations in the same specific objective.Rule 1: Reporting by specific objective Forecast for selected projects and achieved values, both cumulative to date (CPR Annex VII, Table 3).Commission Regulation (EU) 651/2014 declaring certain categories of aid compatible with the internal market in application of Articles 107 and 108 of the Treaty (GBER) (Article 2 (83)-Double counting may still be generated in cases of transregional cooperation with a project supported by more than one programme.NEW7117truetrue
RCO08Nominal value of research and innovation equipmentRCO08 RTDI: Value of R+I equipmenteurooutput0>=0>0PO1 Smarter EuropePO1RSO1.1 R&I capacitiesRSO1.1 Enhancing research and innovationThe total (acquisition) value of the research and innovation equipment supported. R&D equipment includes all apparatus, tools and devices used directly to perform R&D activities. It does not include, for instance, chemical substances or other consumable materials used for carrying out experiments …Supported projectsProvision or acquisition of the R&D equipment for the project supported.No issuesRule 1: Reporting by specific objective Forecast for selected projects and achieved values, both cumulative to date (CPR Annex VII, Table 3).---NEW8118true

CREATE TABLE table_1 (
  "n__1_indicator_code" VARCHAR,
  "n__2_indicator_name" VARCHAR,
  "n__2b_indicator_code_and_short" VARCHAR,
  "n__3_measurement_unit" VARCHAR,
  "n__4_type_of_indicator" VARCHAR,
  "n__5_baseline" VARCHAR,
  "n__6_milestone_2024" VARCHAR,
  "n__7_target_2029" VARCHAR,
  "n__8_policy_objective_asterisks" VARCHAR,
  "n__8b_po_igj_original" VARCHAR,
  "n__9_indicator_usage_by_specific" VARCHAR,
  "n__9b_indicator_listing_by" VARCHAR,
  "n__10_definition_and_concepts" VARCHAR,
  "n__11_data_collection" VARCHAR,
  "n__12_time_measurement_achieved" VARCHAR,
  "n__13_aggregation_issues" VARCHAR,
  "n__14_reporting" VARCHAR,
  "n__15_references" VARCHAR,
  "n__16_corresponding_corporate" VARCHAR,
  "n__17_notes" VARCHAR,
  "n__18_link_to_2014_2020_common" VARCHAR,
  "order_by_annex_1" DOUBLE,
  "order_by_so" DOUBLE,
  "order_by_output_result" DOUBLE,
  "n__0_erdf" VARCHAR,
  "n__0_cohesion_fund_72" VARCHAR,
  "n__0_just_transition_fund_64" VARCHAR,
  "edited_by_swd_2025_61" VARCHAR
);

Share link

Anyone who has the link will be able to view this.